Your Kitchen Journey
We work a little differently to many kitchen companies.
Below are the ten clear stages you’ll move through when ordering your kitchen with us.

Stage 1
Initial Estimate
Share your room dimensions and ideas so we can provide an estimated cabinetry cost.

Stage 2
Design Stage
If the estimate works for you, the next step is a showroom visit or online design meeting.

Stage 3
Deposit & Scheduling
Once you’re happy to proceed, a deposit secures your production slot and shipping schedule.*

Stage 4
Design Refinement
We refine your kitchen design as needed, including post survey refinement where installation is required.

Stage 5
Final Checks
All layouts, measurements and key choices are thoroughly checked and confirmed before production begins.

Stage 6
Production Preparation
We prepare a full production pack with detailed plans, elevations and specifications for manufacture.

Stage 7
Your Kitchen is Made
Your kitchen is carefully built in our specialist workshop in Vietnam by experienced craftspeople.

Stage 8
Shipping & Final Payment
Once your kitchen is ready to ship, we share photos and give you a container number. At this point we request the final balance payment.

Stage 9
Kitchen Arrival
Your kitchen arrives in the UK, clears customs checks and is delivered safely to our warehouse.

Stage 10
Delivery & Installation
Delivery is arranged to site, with professional installation included if you’ve chosen fitting.
* Production slots and shipping schedules are secured by keeping to agreed decision deadlines.
